

Port Authority Planning Studies
- The Port Authority has conducted substantial planning work in its development of the proposed AirTrain project, including a ridership study and an analysis of alternative options for addressing the need for improved access to LGA.
- The Port Authority’s proposed project is subject to environmental review by the FAA. All studies included at the link below have been prepared by the Port Authority. The FAA is conducting independent studies as part of the EIS.
LGA Ground Access Mode Choice Model and AirTrain Ridership Forecast 2025-2045 (Download PDF)
New York City and LGA Access Traffic Conditions: Current and Projected Assessment (Download PDF)
LGA Airport Layout Plan with Proposed Revisions (Download PDF)